-
Platform for dump
The total load proposed on the platform is 40kN/m2. and the plan is 17ft width, 30ft lenght. What should be the thickness of the beam, slab. the platform is for a compactor
-
Rolling Constant
What is Rolling Constant?
-
General idea of construction of a high riser
Nature of foundation provided for 10+ more storey buildings, basement construction and protection of basement structure, drainage and sewage system to be provided in the high rise rand also water supply facility, power backup system especially for lifts and escalators, safety criteria in emergency
-
Lift Operating Machanism
What is the scheduling mechanism used in lift opeartion
-
R E on paving
What do the initials R E scribed on paving denote
-
-
-
-
-
-
-
-
-
Civil Engineering Interview Questions
Ans